How we work
Six steps, the same on every job.
From the first call to the handover, every step leaves a record.
The job
From call to handover.
- 01Tell usWhere, when, how long, which contractors. We visit if it helps.
- 02AppointmentIn writing, before the construction phase starts.
- 03The planPhase plan, site layout, the F10 if notifiable, contractor checks.
- 04Day oneCabins and welfare in, hoarding up, gate staffed.
- 05Every daySign-in, briefings, permits, inspections, the plan kept current.
- 06HandoverSite cleared, file information handed over.
Our site system
We run every site on Clarity PC, the site management system built for Principal Contractors. It is how each step leaves a record.
- Sign-in and roll call. Everyone signs in at the gate on a phone. If the alarm sounds, the roll call is live and nobody is missed.
- Inductions. Each person's induction, training cards and sign-off, kept against their name.
- Method statements and permits. Reviewed and accepted before the work, with a permit for anything high risk.
- Inspections and registers. Recorded on the day with photos, and kept on site.
- The health and safety file. Built from those records as the job goes.
Your own team can see the same records. Ask us about access when we start.