On a construction site, welfare must be in place from the start of the construction phase and kept up until the end. It's one of the first things an HSE inspector looks at, and one of the most common reasons for enforcement on small sites. It's also one of the easiest to get right with a little planning.
What CDM 2015 requires
Schedule 2 of CDM 2015 sets out the minimum welfare facilities. In plain terms:
- Toilets: enough for the number of people on site, kept clean, lit and ventilated.
- Washing facilities: next to the toilets, with hot and cold or warm running water, soap and a way to dry hands. Showers where the work is particularly dirty or the health risk calls for them.
- Drinking water: wholesome, easily reached, clearly marked, with cups unless it comes from a fountain.
- Changing and storage: somewhere to change where people need special clothing, with a place to store clothing and personal belongings and to dry wet clothing.
- Rest facilities: somewhere to rest and eat, with tables and seating, heating, a way to boil water and heat food.
Plan it before the site opens
- Numbers: size the welfare for the peak number of people on site, not the first week.
- Location: close to the work, away from vehicle routes, with safe access. Check where the units will be delivered and whether a crane or a road closure is needed.
- Services: power, water and drainage, or self-contained units with their own supply and waste tanks, which then need regular servicing.
- Booking: hire firms need notice, especially in busy periods. Book them with the start date, not after it.
- Cleaning and servicing: agree who cleans the welfare and how often, and who arranges emptying and refills.
Using the client's own facilities
On a refit or a project in an occupied building, the client's own toilets or canteen can sometimes be used, if agreed in writing, if they're close enough, and if using them doesn't take workers through areas they shouldn't enter. Agree it before the work starts, and have a back-up if access changes.
Short jobs and moving sites
Welfare is still required on short jobs and on work that moves around, such as roadworks or planned maintenance across several sites. The facilities can be scaled to the job, for example a self-contained welfare van, but they must still be there.
Keep it working
Check the welfare every day: clean, stocked, heated, with water and soap. Problems with welfare are the quickest way to lose the goodwill of the people on site, and a run-down welfare unit tells a visiting inspector a lot about the rest of the site.
We book the welfare through our hire partners and have it in place before work begins; see our services. To talk about your site, email gs [at] gewell [dot] co [dot] uk.