If more than one contractor will work on your project, you must appoint a Principal Contractor in writing before the construction phase starts. Our page Do I need a Principal Contractor? covers when the rule applies. This article is about the next step: choosing the right one.
CDM 2015 says that anyone appointing a Principal Contractor must take reasonable steps to make sure they have the skills, knowledge and experience for the job, and, if they're a company, the organisational capability. Here's how to do that in practice.
Start with your project
Before you ask anyone, be clear about the job: where it is, when it starts and for how long, what the work is, which contractors are involved, and whether the building stays in use. The right Principal Contractor for a two-week shop refit isn't always the right one for a phased school project. Our contact page lists the five things we ask every client.
Questions to ask
- Who will actually be on site? Ask for the named person, their qualifications and their site management experience, not just the company's.
- How often will they be there? Every working day, or visits? On a site with several trades, someone needs to control the gate, the inductions and the daily coordination.
- How will contractors be checked? Ask what they check before each contractor starts: competence, cards, insurance, method statements.
- Who provides the welfare? Toilets, washing, drinking water, changing and drying, and somewhere to rest and eat must be in place from the start. Ask who books it, and when.
- What records will you get? Sign-in, inductions, inspections, permits and the information for the health and safety file.
- What insurance do they hold? Ask for the certificates, and check the cover suits Principal Contractor work.
- Have they run similar sites? Occupied buildings, homes, schools, retail: each has its own risks.
What a good proposal includes
- The scope of the Principal Contractor role, in plain words, and what's not included.
- The named site manager and their time on site.
- Site set-up and welfare: what, when, and how long.
- How the construction phase plan will be prepared before work starts.
- How contractors will be managed, and what they'll be asked for before starting.
- What happens at handover, including the information for the health and safety file.
- The written appointment itself, ready to sign.
Warning signs
- A Principal Contractor named on paper with nobody on site.
- A construction phase plan copied from another job, with the wrong address or hazards that don't apply.
- No questions about your building, its occupants or its existing hazards.
- Vague answers about welfare: "the contractors sort that out".
- Accreditation logos offered instead of evidence. Accreditations can help, but ask to see the person's own record.
Appoint early
The earlier you appoint, the more the Principal Contractor can help: planning the site layout, the welfare, the order of trades and the access before contractors are booked. A late appointment leaves less time to get the plan right before day one.
Our free checklist, Before work starts: a client's checklist, covers the appointments and everything else to check before the first contractor arrives.
See our services, or email gs [at] gewell [dot] co [dot] uk to tell us about your site.